$6,225,000 Construction-to-Perm Multifamily Financing; Los Angeles, CA

:
:
:
:
:
:
:

 

  • Rate: 3.6% Fixed 7-years
  • Term: 10 years
  • Amortization: Interest-Only Years 1-2 then 30-year amortization
  • Extensions: One 6-Month Option
  • Guaranty: Recourse
  • Prepayment: 2%,2%,1%,1%
  • Loan Fee: 1%

Transaction Description:

George Smith Partners successfully placed construction-to-perm financing of $6,250,000 for the development of a 19-unit multifamily community in West Los Angeles, CA. The 4-story building will provide 1, 2 and 3-bedroom units in a supply-constrained submarket. The recourse loan provides for two-years of interest-only financing with a 6-month extension that converts to a perm loan with a combined term of 10 years. The starting rate is fixed for 7 years then amortizing. The loan represents 60% of stabilized value and 70% of cost and allows for open prepayment based on a prepayment fee of 2%,2%,1%,1% in years 1 to 4. The Project will be Type-V construction consisting of 4-stories, a rear 750 SF community courtyard, partial ground level and partial subterranean parking. Unit mix includes studio, one and two-bedroom units including two low-income units. All units include covered patios however non-studio units include larger than average outdoor living terraces that range from 130 to 193 SF. Community amenities include a rear courtyard with firepit lounge and BBQ grill. The units average 654 SF in size. The Project represents the Client’s second multifamily construction project. GSP was able to assist in bringing in a qualified general contractor and get the Lender comfortable with the Borrower’s ability to execute despite their limited development track record.

Related Financings